Quifa Field, Colombia

Field infrastructure
Campo Quifa, Colombia

DATA

Year 2010

• Commissioning and startup of Star Project 7 of 7M BPD of fluids, Quifa Field, Meta.

• Commissioning and startup  PAD-1    500 MBD of water, Quifa Field, Meta.

• Commissioning and startup  of CPF Quifa SW Central Production  facilities of 30,000 BPD Heavy Oil 13.5 ° API.

• Increase Capacity of Central Production Facilities in CPF-Quifa up to 45,000 BPD Heavy Oil 13.5 ° API.

Year 2013

• Commissioning and Start-up of new surface facilities needed to achieve sustaining production capacity of 55,000 BPD field Quifa oil.

PLANT FACILITIES – CPF Quifa:

Commissioning and Start-up in the Central Production Facility existing  were executed:

• Third Free Water Knockout tank – FWKO 71,000 barrels of capacity, in conjunction with the Pumping System Free Water.

• Heat Exchanger No 2 Reconditioning to improve its thermal efficiency.

• Electrostatic Treater  No. 9

PLANT FACILITIES – CPF Quifa:

• Third  Skimmer tank  SKIM, together with oil Pumping System and Water Pumping System for treatment.

• A (01) Water Treatment Plant.  Induced Air Flotation Cell, No. 8 PTA capacity.

Injection:

• Commissioning and Start-up  of the pumping system of 650,000 BPD for treated water injection  to wells of  PAD No. 3 were excecuted

STAR PROJECT IN CAMPO QUIFA

• Activities of commissioning and Start-up of new surface facilities needed to achieve sustaining production capacity of 20,000 BPD Field of fluid in the systems shown in the figure below

Quifa Field Commissioning

Date: 2010 to 2013

Project type: Start-up of the central production facilities and the treated produced-water injection system

Scope: Pre-commissioning, commissioning and start-up 

Sector:  Upstream / Production

Client: Pacific Rubiales