THE FIRST REGASIFICATION PLANT OF LNG IN COLOMBIA REACHED ITS MÁXIMUM FLOW

Its been less than a month of its startup, and thanks to a highly qualified group, the 1st LGN (Liquified Natural Gas) regasification plant reached its máximum flow. 400 million (MMSCD) cubic feet daily, to supply the demand of the precious product. The port terminal was built by Sacyr, the spanish multinational. The investment was …

THE FIRST REGASIFICATION PLANT OF LNG IN COLOMBIA REACHED ITS MÁXIMUM FLOW Read More »